Installation process of turbocharger actuators

Apr 29, 2021

When installing, replace the exhaust pipe first, install the booster on the newly replaced bracket, remember to add the rigid parts, and then tighten the four end screws in the amplifier, adjust the position of the air purifier, and then install the rubber pipe to the engine entrance.


Then seal the ends with the hook. Then install the inlet pipe and return pipe, the return pipe should be installed until the main oil channel at the lower end of the cylinder block is sealed. The inlet pipe installed in the inlet pipe is either connected to the upper port of the oil filter, or connected to the oil inlet port of the supercharger of the oil inlet alarm.


According to the type of engine installed in the pipeline, the first new oil, add a few drops in the supercharger and manual rotation of inlet impeller, which can then be installed on the pipe above the special screw, remember two air cushion do not twist too tight, mainly in the case of work began to tighten, as long as the correct installation of all the supercharger, watch out, after installation, The newly installed supercharger must be replaced with oil or oil, no matter the length of time, are not afraid to replace the air conditioner for a few days must be replaced.


When installing, it is necessary to check whether there are cracks in the intake pipe and whether other sundries are cleaned and replaced to avoid maintenance accidents. When everything is sealed up, you can start the machine. When starting, wait a few minutes to see if the oil pressure is normal. Check the parts for oil or air leakage, if not, tighten.


Send Inquiry